Case sharing-Axrest welding workstation project

News

The case I want to share with you today is the axle welding workstation project. The customer is Shaanxi Hande Bridge Co., Ltd. This project adopts the method of welding robot dual-machine linkage of external shaft to improve the welding efficiency, with the initial detection system, arc tracking system, multi-layer and multi-channel functions. Due to the poor assembly accuracy of the workpiece, the problem can be effectively solved with the initial detection system and the arc tracking system. In the tooling part of the middle, the repeated positioning accuracy of the upper and lower materials is high, which provides favorable conditions for the subsequent welding.


Post time:
Nov-16-2023

行业背景与项目启示

“Case sharing-Axrest welding workstation project”需要结合真实制造目标理解。读者应关注该动态希望解决的产能、质量、用工或交付问题,并判断方案是否适配工件、工艺流程和现场条件。

进一步沟通应重点覆盖the agreed scope, factory acceptance criteria, installation conditions, operator preparation and the transition from commissioning to stable production,并通过图纸、样件、节拍数据或现场评审验证关键假设。

项目评估可从工件尺寸与种类、年产量、目标节拍、质量标准、能源介质和场地限制开始,再明确安全边界、上下游接口、换型方式和维护空间。

实施前还应约定可量化的验收标准,例如重复精度、工艺一致性、单位时间产量、换型时间、报警恢复和人员负担,并保留培训、参数备份和维护资料。